Partners

BECOMES A
SMART FILM INSTALLER

BECOMES A SMART 
FILM INSTALLER

BECOMES A
SMART FILM INSTALLER

In-Depth Guidance and Continuous Support

STEPS

BECOMES A SMART FILM INSTALLER

BECOMES A SMART FILM INSTALLER

SFI builds lasting partnerships with film installers. We offer in-depth guidance and continuous support throughout the smart film installation process on existing windows.

In order to qualify as a Film Installer, we recommend the following steps:
This installation is DRY Stick and it usually takes for an experienced film installer 3-4 installations to reach the optimal installation quality.

SFI builds lasting partnerships with film installers. We offer in-depth guidance and continuous support throughout the smart film installation process on existing windows.

In order to qualify as a Film Installer, we recommend the following steps:
This installation is DRY Stick and it usually takes for an experienced film installer 3-4 installations to reach the optimal installation quality.

INSTALLATION OF ADHESIVE FILM

HAS 4 MAIN PARTS

INSTALLATION OF ADHESIVE FILMHAS 4 MAIN PARTS

BEFORE installation of adhesive film, please read carefully our

01

Unpacking & Testing the Film

Open the box carefully and put all films on the long table.

Connect each film to the power via the transformer and verify all work fine.

02

Sticking Expertise

It is a DRY stick…no water allowed; Industrial Alcohol 90% is allowed

Need to clean the glass and film stick side very well, like 2/3 of installation time is glass cleaning

Installer needs patience and persistence, not every technical guy fits…

To stick the film edge you may need a hair fan to soften the film

03

Connecting to Power

Connecting a 48 VAC transformers with remote or switch or both.

Need to weld film wires to the power 

04

Visual & Profiles

Client usually expects you to handle not only the film stick but also the frame

It is recommended to have a film edge under the frame or the rubber

If not possible to hide the film edge under the frame, look for creative ways to hide it with a tape or a panel.

IN ORDER TO BE QUALIFIED AS A FILM INSTALLER, WE RECOMMEND THE  FOLLOWING STEPS 

IN ORDER TO BE QUALIFIED AS A FILM INSTALLER, WE RECOMMEND THE  FOLLOWING STEPS 

BEFORE installation of adhesive film, please read carefully our

Step A

Buy several A4 size samples, ready to plug in to the power.
With these samples you may achieve the following:

Showing to designers, architects and potential clients

Sticking over a glass

Step B

Making several pilots over in your offices
For that purpose, it is recommended:
Choosing ~5 small size windows in your office with access to power.
Reduce 3mm from each of the 4 sides.
If need to cut in for handles or hinges, make a drawing and we will make the cuts
Our shipment to you will include:
​Film cut per your size with wires already prepared
Transformer – output 48/60 VAC – switch + remote
Squeezers – tool to make the stick
Leftover films to train
Installation Guide/Video/Tips
Neutral No Alkoxy No ACID Silicone. Silicone MUST be one of these (no warranty for using other brand):
Dow Corning: 795, 799, 995, 1199
Tosseal: 83, 381

Step C

Making a first project with a real client...
Only after Step C is successful we recommend to start
commercially pushing the product.

APPLICATIONS

OUR ADHESIVE FILM PROJECTS

OUR ADHESIVE FILM PROJECTS